Construction on new bridge underway

Author: | Posted in Uncategorized No comments
IMG_0110
Construction is set to begin shortly as a new pedestrian bridge is built over the Milwaukee River connecting Main Street and Vest Park in downtown West Bend to the east side of the river, Veterans Avenue and the Museum of Wisconsin Art.
 
IMG_0112
Brick pavers have already been removed from a section of the walkway along Veterans Avenue.

Add Your Comment

Social Media Auto Publish Powered By : XYZScripts.com