42.4 F
West Bend

Museum of Wis. Art open during bridge installation

522685_10151477916834710_1206739331_n

The new bridge over the Milwaukee River is set to be installed Thursday. Contractors will have the area on Veterans Avenue from East Washington Street to Water Street closed to through traffic from 11 a.m. – 1 p.m.

 

The bow truss pedestrian bridge will be delivered and then ‘dropped’ into place.

The bridge will have a concrete deck with prefabricated steel trusses that will be painted white.

The new pedestrian bridge extends from Service Drive over the Milwaukee River with direct access to Veterans Avenue and the Museum of Wisconsin Art.

MOWA will be open during the bridge construction.

 

Leave a Reply

Work or the content on WashingtonCountyInsider.com cannot be downloaded, printed, or copied. The work or content on WashingtonCountyInsider.com prohibits the end user to download, print, or otherwise distribute copies.

Subscribe

FREE local news at Washington County Insider on YouTube

Related Articles