2.4 F
West Bend

Road projects in Town of Addison and Town of Trenton

 September 12, 2020 – Washington Co., WI – One road project is underway in Washington County and one is getting ready to begin next week. An update from the DOT is posted below.

Washington County

WIS 175 over Limestone Creek in the Town of Addison

  • Bridge deck overlay
  • A full closure of WIS 175 at Limestone Creek will be in effect September 8 through September 25.
    • Detour will utilize WIS 33 and County W, local access will be available up to the road closure at the bridge.
    • Overview/detour

WIS 33 over the Milwaukee River in the Town of Trenton

  • Work includes bridge deck repair and over
  • Full closure of WIS 33  over the Milwaukee River for approximately 3 weeks starting September 14.
    • Through traffic will be detoured along County M and Main Street in Newburg.
    • Local access will be available up to the road closure located at the bridge.
    • Overview/detour

Leave a Reply

Work or the content on WashingtonCountyInsider.com cannot be downloaded, printed, or copied. The work or content on WashingtonCountyInsider.com prohibits the end user to download, print, or otherwise distribute copies.

Subscribe

FREE local news at Washington County Insider on YouTube

Related Articles